For small groundworks, drainage and civils subcontractors

Site-specific RAMS, written around your job and reviewed by a practising civils MD.

When the principal contractor asks for your RAMS before you can start, send the job details. You get a document written for the actual work — not a generic template with your logo on it. Standard turnaround is two working days.

  • Two working daysStandard turnaround for a custom RAMS, once we have the job details.
  • Reviewed, not just generatedChecked by Richard Fisher, a practising civils MD, or another competent person.
  • From £19, or £95 customTemplates, site-specific RAMS, CDM plans and monthly desks. Prices exclude VAT.

Why this is different

Written and reviewed by someone who still works on live sites.

RAMS Desk is run by Richard Fisher, managing director of Fisher CC Ltd, a UK civils contractor. He writes and signs the same kind of documents for his own groundworks, drainage, slab and yard work on live FM and distribution sites, under CDM.

A practising civils MD

The review is not a desk exercise. It is done by someone used to principal contractor expectations on working sites.

Built for civils work

Groundworks, drainage, excavations, slabs, hardstanding and yards — including work around live traffic and trading operations.

You still sign it off

Every document is a draft for you to check against the actual job, plant, people and site rules before it is used.

Prices

A simple ladder, from a template to a monthly desk.

Choose a single document when you need one in a hurry, a pack to get onto a managed site, or a monthly plan if you send RAMS in regularly.

Templates

Editable civils templates

£19 or £59 for the pack

£19 for a single generic RAMS in Word. £59 for a civils pack of 10 documents, including drainage, groundworks, slab, excavation and work near live traffic. Yours to edit and keep.

Most often needed

Custom site-specific RAMS

£95 or £145 higher-risk

Written for one activity on your job, with a risk assessment, method, briefing sheet, and Word plus PDF. Higher-risk work such as deep excavation, work at height, confined space or live services is £145. Extra activity £35. One revision included.

CDM

Construction phase plan

£149 or £249 notifiable

£149 for a construction phase plan on a small or non-notifiable project. £249 where the project is notifiable. We will say so, and quote, if the job is larger than that.

Best value to get on site

New-subbie starter pack

£395

Three bespoke RAMS, a construction phase plan, five toolbox talks, two COSHH assessments and a policy set — the usual pack a subcontractor needs to start on a managed site.

Monthly · Lite

RAMS Desk Lite

£55 a month

Two custom RAMS a month, with your company details on the documents. Monthly, cancel any time. Unused documents do not roll over.

Monthly · Standard and Pro

RAMS Desk Standard or Pro

£125 or £199 a month

Standard is six custom RAMS a month, plus the template library and one construction phase plan review a quarter. Pro is 15 custom RAMS a month, with priority 24-hour turnaround, on a fair-use cap.

Prices are shown excluding VAT. The VAT treatment needs to be confirmed before this page goes live, because the service would currently trade under Fisher CC Ltd. 24-hour rush is available on custom RAMS at +£30, and a repeat or update of an existing method for a new site is £45. Higher-risk or unusual work may need a quote first. We will always confirm the price before starting.

How it works

Send the job details. Get a reviewed document back in two working days.

The standard turnaround for a custom RAMS is two working days from when we have the information we need. Construction phase plans and starter packs can take longer — we will say so before we start. 24-hour rush is available on custom RAMS.

  1. Send the job details

    A short form covering the task, site, plant, people, access and any client requirements. About five minutes on your phone.

  2. We draft it

    Your document is written around the job you described, using a civils library as the base, not a blank page.

  3. Reviewed by a competent person

    Richard Fisher, or another competent reviewer, checks and edits the draft. The reviewer’s name goes on the document.

  4. You check and approve it

    You receive Word and PDF, plus a crew briefing sheet. You check it against the actual job and approve it before use. One revision is included if the client or principal contractor asks for changes.

Sample

What the method looks like on the page.

An extract only, to show the tone and level of detail. It is not a complete RAMS and must not be used on site.

Sample excerpt — not for use on site

Laying a surface-water drain in a live service yard — sequence of work (extract)

  1. Arrive, report to the site manager and attend the site induction. Confirm the day’s HGV movements and the agreed work window before unloading plant.
  2. Hold point: do not break ground until a permit to dig is in place, service drawings have been reviewed, and the excavation line has been scanned with a CAT and genny.
  3. Set out exclusion zones, pedestrian routes and banksman positions before plant is offloaded. Protect existing interceptors, chambers and any live drainage that must stay in service.
  4. Excavate to formation in short, supported or battered lengths, with safe access and egress, and inspect the excavation at the start of each shift and after any event that could affect stability.
  5. Lay, bed and surround the pipework to the agreed specification, make good connections, and backfill in layers. Leave the yard clean, with temporary covers or plating in place if the area must reopen to traffic the same day.

This is a short fictional extract for illustration. A complete RAMS would also include document control, a full risk assessment, plant and competence, emergency arrangements, and a briefing sign-off sheet.

Free download

What a principal contractor expects in your RAMS.

A two-page checklist, written against CDM 2015 and HSE guidance, for small groundworks, drainage and civils subcontractors. Use it to review your own documents before you send them in.

It covers document control, scope, method, risk assessment, plant and competence, underground services, coordination, emergencies and briefing — plus the civils-specific checks that often get a document sent back.

Email me the checklist

Placeholder only. This sign-up form is not connected yet. Nothing you enter will be stored or emailed.

Until the email form is connected, you can download the checklist PDF directly. Or email info@fisherccl.co.uk.

Questions

FAQ

Is a method statement a legal requirement?

A written method statement is required before demolition, dismantling or structural alteration. For other construction work it is not generally a legal requirement, but HSE describes method statements as a proven way to plan, manage and monitor the work, and most principal contractors will ask for one. Employers must still assess health and safety risks, and record the significant findings where five or more people are employed. Separate assessments are required for certain hazards, including work at height, COSHH, manual handling, noise, vibration and lead.

Do I still have to check the document?

Yes. The documents we prepare are drafts for you to check against the actual site, task, plant, people and client requirements. You remain responsible for making sure the RAMS is suitable and sufficient for your work, for briefing your team, and for updating it if conditions change. We do not give legal advice, and we cannot guarantee that a principal contractor or client will accept any document.

Who reviews and signs it off?

Richard Fisher reviews documents himself at the outset. As volume grows, another competent person may review them, with their name on the document. You still check and approve the finished draft before it is used on site.

How quickly can I have it?

The standard turnaround for a custom RAMS is two working days from when we have the information we need. 24-hour rush is available on custom RAMS at +£30. Construction phase plans and starter packs can take longer, and we will confirm the timescale before starting.

What if the principal contractor asks for changes?

One revision round is included if the client or principal contractor asks for changes. Send us their comments or their required format and we will update the document.

Is VAT included?

No. Prices are shown excluding VAT. The VAT treatment will be confirmed before this page goes live, because the service would currently trade under Fisher CC Ltd.

What work is not covered by the fixed prices?

Larger or unusual jobs, and some higher-risk work such as demolition, confined spaces or work near live services, may need a quote first. We will always confirm the price before we start.

Who am I contracting with?

RAMS Desk is a working brand name for a service run by Richard Fisher, MD of Fisher CC Ltd. It currently trades under Fisher CC Ltd. The brand can be changed later if the service is set up under its own company.

Get started

Send the job details, or ask a question.

Email is the best way to book a document or talk through what you need.

Email info@fisherccl.co.uk